Start with the problem
Scope the inspection before anyone arrives
A fire door inspection request is scheduled work, so the best first step is a clear opening count and building contact—not an emergency-only call path. Property managers, facility teams, building engineers, schools, medical facilities and contractors should prepare the property type, number of openings and any deadline or authority request before calling.
NFPA 80 addresses inspection, testing and maintenance of fire door assemblies, but the standard, adopted code and authority having jurisdiction can affect what a specific building needs. This page is service-planning information, not a legal determination. Share the governing request or project documents when available.
!An owner, manager or authority requested an inspection
!A property inspection deadline needs to be scoped
!Opening inventory or labels need review
!Doors do not self-close or latch
!Clearance, damage or field-modification concerns
!A written deficiency format may be required
!Corrections need to be scoped separately
!Multiple buildings or floors require coordination