Facility Pre-Screen: What to Record First
Scope: Record visible conditions without altering or testing beyond facility procedures. The applicable code edition, inspection interval, assembly listing, required qualifications, and final acceptance must be confirmed for the property.
- Record whether rated labels appear present and legible on door and frame assemblies.
- Record observed self-closing and latching behavior under the property's approved facility procedure.
- Record visible panic-bar, exit-device, and closer operating concerns.
- Note visibly irregular clearances, gasketing condition, and door/frame damage for qualified review.
- Capture observations by opening ID so the responsible inspector can determine next steps.